Silverstone Excavating is contracted for comprehensive civil and infrastructure works, including the construction of the Steqoye Road extension and a major sanitary sewer extension along Pipehom Road. Their scope covers site preparation, grading, and asphalt paving, alongside the installation of extensive underground water, storm, and sanitary utility systems, concluding with stormwater management improvements and complete site restoration.

The Steqoye Road Extension project involves the construction of new roadway and underground municipal infrastructure within Seabird Island in Agassiz, BC. Undertaken for the Seabird Island Band, the project is intended to improve local road access and provide essential servicing infrastructure to support development in the surrounding community. Silverstone Excavating's scope includes roadway construction, earthworks, watermain installation, storm drainage improvements, and a substantial sanitary sewer extension along Pipehom Road.

Silverstone Excavating's scope includes site preparation, excavation, grading, and construction of the new Steqoye Road extension, including a cul-de-sac turnaround and connection to the existing road network at Pipehom Road. Roadworks include subgrade preparation, placement and compaction of granular road base materials, and asphalt paving.

Underground servicing includes installation of watermain infrastructure, storm drainage piping, catch basins, and associated municipal connections. The project also includes a substantial sanitary sewer extension along Pipehom Road, complete with new sanitary mains, manholes, and connections to existing infrastructure.

Additional work includes trench excavation, backfilling, stormwater management improvements, and associated site restoration.

The Challenge

The project involves coordinating new roadway construction with multiple underground utility installations while integrating the improvements into the existing community infrastructure. Careful attention to grading, drainage, and utility elevations is required to accommodate the new road alignment and ensure proper integration with the surrounding road network.

Although the project has not presented significant unforeseen construction challenges, managing the different components of roadway construction and underground servicing requires effective planning and coordination to maintain an efficient construction sequence.

Our Approach + Results

Silverstone Excavating has successfully completed the initial phase of the project, including construction of the Steqoye Road extension and associated underground servicing. The roadway has been brought to the final paving stage, with earthworks, road base preparation, and underground utility installations completed.

Through effective planning and coordination, the initial construction phase progressed efficiently without significant complications. The remaining work includes completion of the substantial sanitary sewer extension along Pipehom Road and final roadway paving.

Upon completion, the project will deliver improved road access and expanded municipal servicing infrastructure to support continued development within the Seabird Island community. The work completed to date demonstrates Silverstone's capabilities in municipal roadway construction, underground utilities, and coordinated civil infrastructure development.