George Massey Tunnel

Project Overview
Client Name
Bc Ministry of Transportation and Infrastructure
Timeline
2023-2024
Scope of Work
Trenching, backfilling through soil and asphalt. Installation of HDPE and rigid PVC underground communications conduits. Trenchless conduit installations and 26 concrete utility vaults.
The Challenge
Working along one of Metro Vancouver's busiest transportation corridors presented significant logistical and operational challenges. While most construction activities took place during daytime hours, several critical installations required overnight shifts involving full lane closures on Highway 99.
Coordinating these closures required careful planning, precise scheduling, and efficient execution within restricted work windows. Crews also had to navigate existing underground utilities, constrained working areas, and the complexities of performing extensive civil construction alongside an active major highway while minimizing disruption to traffic.
Our Approach + Results
Silverstone approached the project through detailed construction planning, coordinated scheduling, and strategic deployment of crews and equipment. Daytime operations were organized to maximize productivity, while critical work requiring highway closures was carefully scheduled for overnight shifts.
By combining conventional excavation with trenchless installation methods, Silverstone completed approximately 3.5 kilometers of trenching and the associated underground infrastructure installations. The work also included concrete utility structures and equipment foundations supporting the upgraded control system.
The project demonstrated Silverstone's ability to execute complex underground infrastructure upgrades within a heavily travelled transportation corridor, while managing challenging site conditions, demanding traffic requirements, and multiple construction activities.