Eastleigh Utility Upgrades 

Eastleigh Utility Upgrades

Project Overview

Client Name

Whitetail Homes Ltd.

Timeline

6 months

Scope of Work

Sanitary, water, hydro and tel, streetlighting, curbs, sidewalks and roadworks upgrades down Eastleigh Crescent to support new condos being built.

The Challenge

This project included the installation of new sanitary sewer, watermain, hydro and telecommunications infrastructure, as well as curb, sidewalk, and paving works for a new apartment development. The most challenging component was the installation of approximately 250 metres of new sanitary sewer through extremely unstable pit run soils, where excavation stability was a constant concern and extensive shoring was required to safely manage the risk of cave-ins. The work was further complicated by a very narrow roadway that required maintaining one-way traffic throughout construction, numerous existing utility crossings, and the need to connect multiple existing buildings to the infrastructure. In addition, excavation was carried out alongside a FortisBC intermediate-pressure gas main, requiring a FortisBC permit, continuous FortisBC supervision, and hydrovac excavation within 10 metres of the gas main.

Our Approach + Results

Detailed planning, phased construction, and proactive coordination allowed all
underground utilities and surface works to be completed efficiently while maintaining one-way traffic throughout construction. Extensive shoring, hydrovac excavation around the gas main, and close coordination with FortisBC ensured the sanitary installation was completed safely, existing services were successfully tied into the new system, and the overall project remained on schedule.